Company News
New 6,000 m² assembly bay enters operation
The additional bay removes the bottleneck between fabrication and factory testing, shortening standard-build lead times.

Live demonstrations of the KZ-QT6-15 block machine and the KZ-DC2000 dust collector, plus engineering consultations on precast line configuration.
We will be exhibiting at the 2026 China Construction Machinery Fair in Zhengzhou, with working demonstrations of two machines from our range.
The KZ-QT6-15 automatic block machine will run on a full mould set covering hollow blocks, solid bricks and paving stones, with a mould change shown live each afternoon. The KZ-DC2000 pulse-jet dust collector will be shown with its capture hood range, which is the part of a dust control system that most often decides whether it works.
Our precast engineering team will be available for one-to-one consultations on line configuration. If you are planning a precast factory, bring your element drawings and target output and we can work through the line layout and mould inventory with you on the stand.
## What to bring
– Element drawings or a product list, if you are planning a precast plant
– Your power supply specification (voltage, frequency, phase)
– Site footprint and headroom constraints
– Target output per shift, and your shipping port if you need an Incoterm quotation
Stand details, hall number and opening times will be published on this page once the organiser confirms allocation. To arrange a specific appointment slot in advance, contact our export team directly.
Questions about anything in this article? Send us your operating conditions and we will answer with figures rather than a brochure.
Company News
The additional bay removes the bottleneck between fabrication and factory testing, shortening standard-build lead times.
Company News
Fast-moving wear parts and hydraulic components now held closer to major export markets, cutting emergency air-freight costs.
Project Update
A KZ-PC150 line has passed its performance test and entered series production for a 400-unit housing programme.