Skip to content

Spare parts stock points added for EU and Middle East customers

Fast-moving wear parts and hydraulic components now held closer to major export markets, cutting emergency air-freight costs.

Spare parts stock points added for EU and Middle East customers

We have added spare parts stock points serving European Union and Middle East customers, holding the components that most often stop a machine.

The parts held are selected from three years of spares order history: filter elements, belt and chain components, screw flighting sections, hydraulic seals and cylinders, motor and gearbox spares, and PLC modules for our standard control platforms.

## Why it matters

A dust collector filter or an elevator chain failing should not cost three weeks of air freight. Holding the fast-moving items regionally means a routine replacement arrives as a road shipment rather than an emergency flight.

Stock in these locations covers standard models only. Custom-built machines continue to draw spares from the factory, and we recommend ordering a recommended spares kit with a custom machine so the first replacement is already on site.

To check availability of a specific part, send us the machine model, serial number and a photograph of the component with its nameplate where possible.

Talk to the team

Questions about anything in this article? Send us your operating conditions and we will answer with figures rather than a brochure.

Keep reading

Related articles

KZONG to exhibit at the 2026 China Construction Machinery Fair Company News

KZONG to exhibit at the 2026 China Construction Machinery Fair

Live demonstrations of the KZ-QT6-15 block machine and the KZ-DC2000 dust collector, plus engineering consultations on precast line configuration.

New 6,000 m² assembly bay enters operation Company News

New 6,000 m² assembly bay enters operation

The additional bay removes the bottleneck between fabrication and factory testing, shortening standard-build lead times.

Precast production line commissioned for Middle East housing project Project Update

Precast production line commissioned for Middle East housing project

A KZ-PC150 line has passed its performance test and entered series production for a 400-unit housing programme.

WhatsApp