Skip to content

Projects & Case Studies

Installations rather than brochures. Each case records the constraint the client actually had, what we specified, and what changed once the plant was running.

6
Reference projects
6
Countries delivered
4
Industry sectors
2025
Most recent
Reference installations

Filter by sector, or read the whole set

Sector labels follow the client's own industry. The engineering problems repeat across sectors more often than you would expect.

Dust control retrofit at an aggregate crushing plant Environmental Protection
Indonesia · 2023

Dust control retrofit at an aggregate crushing plant

Three pulse-jet collectors and local capture hoods installed at the crusher discharge, screening deck and conveyor transfer points to bring the site inside local emission limits.

Construction and demolition waste recycling yard Environmental Protection
Chile · 2025

Construction and demolition waste recycling yard

A 50 t/h sorting and processing line that turns demolition arisings into recycled aggregate for sub-base work, diverting material from landfill.

Planning a similar installation?

Tell us the site conditions, the target output and the constraint you are working around. We will say plainly whether we have done it before.

WhatsApp